When you have a new Site or Building Unit, you will need to create the Site, Building Unit and any Accounts, Meters, Sub Meters, Virtual Meters, Channels and Supply Points.
Once you have created these (or if they already exist), you create the Tenant and the associated Items.
Click on the link for more information on Creating Tenants
Adding a Site
- Right click on the Site Group
- Click Add
- Click Site
- Enter the Site Name, Benchmark, ID's on the Site tab
- Click on the Location tab and enter the address details
- Click OK
Adding a Building Unit
- Right click on the Site
- Click Add
- Click Building Unit
- Enter the Name (mandatory), Unit reference and Location
- Click OK
Adding a Meter
- Right click on the Site
- Click Add
- Click Meter
Field | Description |
---|---|
Name | Add the Meter Serial Number |
Number | Add the Meter Serial Number |
Identifier | Add the Meter Serial Number |
Location | Enter the location (if known) |
Commodity | Choose Electricity, Gas, Water etc |
Meter Type | Choose Code 5, Domestic etc |
Use installation date | Tick to add a date |
Installation date | Add the date the meter was installed |
- Click OK
Adding a Periodic Channel
Once you have a Meter, you need a Channel to hold the consumption data.
Choose either Non-Periodic Channel or Periodic Channel.
- Right click on the Meter
- Click Add
- Click Non-Periodic Channel (or Periodic Channel)
Field | Description |
---|---|
Name | Enter the name of the Channel (usually the supply number or the meter number) |
Data Load ID 1 | If half hourly downloads, this will need to be the identifying number on the import |
Data Load ID 2 | Rarely used, but some imports may have 2 IDs |
Channel Register | Choose from All Day, Day, Night etc (default is All Day) |
Data type | Defaults to Energy Consumption for Gas and Electricity, change to Volumetric Consumption for Water |
Time Zone | This should be the same as the Time Zone set in the Billing Group. Click here for details of the Billing Group Setup |
Unit of Measurement | Defaults to kWh for Gas and Electricity, change to M3 for Water |
Conversion Factor | Defaults to 1 |
Data Measurement | Defaults to Consumption |
Channel Data Quality | Defaults to Primary |
Closed | Only used if closing the Channel |
Meter Readings | Tick to indicate that the consumption will be entered in meter readings (not as consumption values) |
Field | Description |
---|---|
Minimum Value | Defaults to 0 |
Auto Max | Untick to allow a Maximum Value to be added |
Maximum Value | This is the reading at which the meter clocks. For example it the maximum amount of numbers in the reading is 5, then 99999 would be entered into this field. Once this reading is reached, the Meter will clock |
Clocking Threshold (CFT) | A figure between 0 – 100 (percent) is added. 0 would mean the Meter never clocks, 100 would mean if the Meter Reading entered is lower than the previous, Sigma will assume it has clock. Its recommended to add a figure of 100 |
Max is Last | Defaults to unticked |
- Right click on the Site
- Click Add
- Click Sub Meter
- Complete the Meter Editor pop up in the same way that you would a standard Meter (see above)
Once created, create a Non-Periodic or Periodic Channel underneath, in the same way that you would for a standard Meter (see here)
Adding a Virtual Meter
A Virtual Meter can be added when you don't have an actual meter and you want to use consumption values from one or more other Meter or Sub Meters.
Virtual Meters can also be used with calculations. For example you may have a Sub Meter in a Shop Unit, but you also want to charge a portion of the Main Meter. Both Meters are added to the Virtual Meter and a sum entered with the equation.
- Right click on the Site
- Click Add
- Click Virtual Meter
Field | Description |
---|---|
Name | Enter the name for the Virtual Meter |
Description | (optional) |
Commodity | Choose from the dropdown |
Equation | Leave blank if you want to add together all of the Meters in the Selected section An example equation may be that you want to charge for a Sub Meter and a 1/4 of the Main Meter. The Equation would be [1]+([2]/4). |
Selecting from items of type | Defaults to Meter. Can be changed to:
When you change the Item type here, the Unselected box will show any available |
Show all tickbox | Tick to show all available Meters across the whole database |
Unselected | Shows any available Meters for the Site The search field allows you to search all the Meters |
Selected | Drag and drop Meter(s) from the Unselected section |
Click OK to save
Adding an Utility Account
An Account is required if you intend to enter your Utility Bills into Sigma and then use the consumption details for billing Tenants.
- Right click on the Site
- Click Add
- Click Account
Field | Description |
---|---|
Account Number | Enter the Utility bill Account Number |
Commodity | Choose the Commodity from the dropdown list |
- Click OK to create the Account
Creating a Tariff Connector (if using Consumption from the Utility Bills)
Click here for more details on how to create a Tariff Connector