Sigma Online User Manual

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 7 Next »

Introduction

A Provider is used to describe an Energy Supplier and can be one of the following:

  • Supplier
    • will generate and distribute energy sources to their customers
  • Meter Operator
    •  a company that installs and maintains meters
  • Data Collector and Accumulator 
    • a company that collects periodic data from meters in various ways

 Contract sits under a Provider and will detail the general terms and conditions that you have agreed with your Supplier, Meter Operator or Data Collector/Accumulator.  A Contract can be one of the following:

  • Supply
  • MOP
  • DCA
  • Export
  • Generation
  • Tenant

The main reason for including Contracts in Sigma is so you can ensure that your billing is reflective of any terms that have been previously agreed with your Provider.

A Contract can be Permanent, or specific dates ranges can be added.


Creating a Provider

From any Activity with a Data Selector, change from Item Finder to Tree Selector

  • Right click on PROVIDER
  • Click Add Provider 

         


The Provider Editor popup appears.

  • Enter the name of the Provider, ie AWA
  • Enter a description (optional)
  • Enter a Financial Code (optional)
  • Tick the Provider type (you can choose more than one).  Choose from
    • Meter Operator
    • Data Collector and Accumulator
    • Supplier 
  • Add a Location on the Location tab (optional)

         


  • Click OK to save

The Provider will now show in the list in the Tree Selector

Creating a Contract

Once you have a Provider, you can add a Contract

  • Right click on the Provider
  • Click Add 
  • Click Contract 

         


The Contract Editor popup appears.

  • Enter a Title for the Contract, ie AWA
  • Choose the Commodity from the dropdown list
  • Choose the Service Type.  Choose from:
    • Supply (the default)
    • MOP
    • DCA
    • Export 
    • Generation 
    • Tenant
  • The Quality and Tariff dropdowns are not required
  • Enter a date range (if the contract has a start and end date 

          or

  • Tick Permanent if there is no start or end date

         

  • Click OK to save


The Contract will now show under the Supplier in the Tree Selector

         


Linking a Supply Point to a Provider and Contract

Now that the Provider and Contract are in Sigma, these can be added to a Supply Point.

Use the following links to help you:






  • No labels