If the meter is faulty or there has been a routine change, you need to update Sigma.
...
The Meter Editor popup appears:
- Tick De-energised
- Add the de-energised date (optional)
...
- Click OK
- Complete the Meter Editor popup
- Name – Add the Meter Serial Number
- Number – Add the Meter Serial Number
- Identifier - Add the Meter Serial Number
- Location – Enter the location (if known)
- Commodity – Choose Electricity, Gas, Water etc
- Meter Type – Choose Code 5, Domestic etc
- Asset Type - Choose from the dropdown list (not mandatory)
- Parent Meter - Choose the Parent Meter from the dropdown list (if the Meter is on the same Site), or search using the Magnifying Glass)
- Use installation date – Tick to add a date
- Installation date – Add the date the meter was installed (not mandatory)
- Click OK to create the Meter
The new Meter now shows in the Meters section:
Adding a Periodic (or Non Periodic) Channel
...
- Enter the new Meter number (or replace if it has an existing Meter number)
- Click OK to save
Adding the Meter to the Supply Point
...
- Drag and Drop the new meter from the Available Meters to the Selected Meters
- Click OK to close the Supply Point Editor and update the Supply Point
...