Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

If the meter is faulty or there has been a routine change, you need to update Sigma.

...

The Meter Editor popup appears:

  • Tick De-energised
  • Add the de-energised date (optional)

...

  • Click OK
  • Complete the Meter Editor popup
    • Name – Add the Meter Serial Number
    • Number – Add the Meter Serial Number
    • Identifier - Add the Meter Serial Number
    • Location – Enter the location (if known)
    • Commodity – Choose Electricity, Gas, Water etc
    • Meter Type – Choose Code 5, Domestic etc
    • Asset Type - Choose from the dropdown list (not mandatory)
    • Parent Meter - Choose the Parent Meter from the dropdown list (if the Meter is on the same Site), or search using the Magnifying Glass)
    • Use installation date – Tick to add a date
    • Installation date – Add the date the meter was installed (not mandatory)

                  

  • Click OK to create the Meter

The new Meter now shows in the Meters section:

         


Adding a Periodic (or Non Periodic) Channel

...

  • Enter the new Meter number (or replace if it has an existing Meter number)

          

  • Click OK to save

Adding the Meter to the Supply Point

...

  • Drag and Drop the new meter from the Available Meters to the Selected Meters

                


  • Click OK to close the Supply Point Editor and update the Supply Point

...