Sigma Online User Manual

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 9 Next »

There are two in this section, one is specifically for Electricity.

  • Invoice vs Calculated
    • Compares the total value of the invoice (as calculated by Sigma) against the total value declared on the invoice
  • Electricity Invoiced Vs Calculated
    • Compares the total value of the Electricity invoice (as calculated by Sigma) against the total value declared on the invoice

  • Gas Invoiced Vs Calculated
    • Compares the total value of the Gas invoice (as calculated by Sigma) against the total value declared on the invoice

Validator Set Up

 GB – InvoicedvsCalc                                                  GB – ElecInvoicedvsCalc                                                                                           

                   


GB – GasInvoicedvsCalc


Variables

VariableDescription
Bill will pass validation if the Query Value is less than (£)Enter a monitory figure, for example 0.5  The Validator will only fail if the value of the difference is above 50p, or 5 for £5.00
Tolerance value (%)The percentage you want the invoiced and calculated costs to be within.  For example, enter 1 for 1%

Bill Entry details

Electricity                                                                                                                                              Gas                                                                                 

                   

Failure Prompt

Invoice Vs Calculated                                                            Electricity Invoice Vs Calculated                                     

                    


Gas Invoiced vs Calculated


Electricity Invoice Vs Calculated Failure

Invoice cost differs from calculated: FAILED - The name of the Validator

'totalBilledCharge=136.00' - The total charges entered in the Bill this Period field £136.00  

'tolerance=1.00' - The percentage tolerance, ie 1%

'upperthreshold=137.36' - The upper threshold (the value in the Billed this period field, plus 1%  - ie £136.00 + £1.36 (1%) = £137.36

'MinimumQueryValue=5.00' - The minimum amount the query needs to be (in £s) for the Validator to fail, ie £5

'lowerthreshold=134.64'  - The lower threshold (the value in the Invoice cost field, minus 1%  - ie £136.00 - £1.36 = 134.64

'totalCharge=126.00' - The amount  in the Invoice cost field (the amount Sigma calculates the bill to be), £126.00

'QueryValue=10.00' - The difference between the Bill this period field and Invoice cost field, ie  £136.00 - £126.00 = £10.00






  • No labels