Introduction
Meters to Supply Point Assignment Issues
This report identifies:
- Meters linked to multiple supply points overlapping the same period
- Meters not linked to a Supply Point
This issue has the potential to result in the consumption for the meter (during the time period that overlaps) being potentially double counted.
Water Meters linked to Supplies via Supply (Water) commodity Service Types are not included as this can be a valid configuration.
Resolution: Investigate the Meter’s Supply Point assignment and ensure that, if correct, there are no reports in use that will result in the double counting of the Meter’s consumption, or configure the Supply Point to be excluded from Best Available Consumption View Reports.
Opening the Report
Open Energy Intelligence and search for the Report OR click on the link below to log into Energy Intelligence and open the Report for you:
No Issues
If there are no issues, ie there are Meters not linked to a Supply Point, or linked to Multiple Supply Points, the following appears:
SCREEN SHOT