Sigma Online User Manual

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

Introduction

         



Meters to Supply Point Assignment Issues

  • Meters missing a Supply Point Link
  • Meters Linked to Multiple Supply Points

Identifying meters that are assigned to multiple supply points overlapping the same period or not assigned to any. This issue has the potential to result in the consumption for the meter (during the time period that overlaps) being potentially double counted. Water Meters linked to Supplies via Supply (Water) commodity Service Types are not included as this can be a valid configuration. Resolution: Investigate the meter’s supply point assignment and ensure that, if correct, there are no reports in use that will result in the double counting of the meter’s HF consumption.


  • No labels