Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Table of Contents

Introduction

...

Meters to Supply Point Assignment Issues

...

This report identifies:

  • Meters

...

  • linked to multiple supply points overlapping the same period

...

  • Meters not

...

  • linked to a Supply Point

This issue has the potential to result in the consumption for the

...

meter (during the time period that overlaps) being potentially double counted.

Water Meters linked to Supplies via Supply (Water) commodity Service Types are not included as this can be a valid configuration.

Resolution: Investigate the

...

Meter’s Supply Point assignment and ensure that, if correct, there are no reports in use that will result in the double counting of the

...

Meter’s consumption, or configure the Supply Point to be excluded from Best Available Consumption View Reports.



Opening the Report

Open Energy Intelligence and search for the Report OR click on the link below to log into Energy Intelligence and open the Report for you:

...