Sigma Online User Manual

Average ppu Threshold

GB – AverageppuThreshold

Checks the bills average pence per unit value (a combination of the green charges) is equal to or less than the defined PPU limit entered in the validator.

The average pence per unit is a combination of the green charges

  • Green units

  • BSUOS units

  • Renewable fuel obligation unit charges

  • The banded charges A-H on the General tab including banded units from 'ExtraCalcs'

  • Unbanded units from ExtraCalcs (those towards the bottom of the screen - the bottom right cost total)

  • The units charges broken down  into bands in the OtherItems tab


Validator Set Up


Variables

VariableDescription
Unit rate threshold (p):

checks that the average pence per unit is less than the figure added here.  

In this example, the average ppu would need to be below 10.5 for it to pass.


Bill Entry Screen

This is the Supply Overview.  If you cannot see the Gross Avg. PPU column, click here for more details on how to add it


Failure prompt


Average unit rate exceeds threshold: FAILED - The name of the Validator

'threshold=10.50' - The threshold added to the Validator

'ppuunit=10.60 - The figure in the Gross Avg. PPU column, ie 10.60



@ Copyright TEAM - Energy Auditing Agency Limited Registered Number 1916768 Website: www.teamenergy.com Telephone: +44 (0)1908 690018